America’s grid upgrade hinges on a 400-ton machine designed in the 1800s — and just one U.S. mill makes the special steel inside it
Between 2019 and 2025, demand for generator step-up transformers, those that connect power plants to the transmission grid, nearly tripled.
Full story
Read the full story at Fortune ↗
Continue reading this story on Fortune, the publisher that reported it.
AI tools
Written by AI from the article text. It can make mistakes; check the original story.