Stronger concrete needed to fix ‘basic mistake’ of defective MTR station columns: experts
Hong Kong’s railway operator can use high-strength concrete to rectify the structure of dozens of defective columns at a station under construction, an engineer and a construction sector leader have said, describing the shoddy work as a “basic mistake”. Their remarks came after the Buildings Department revealed on Saturday that about 30 columns at the Tung Chung West MTR station…
Continue reading this story on South China Morning Post, the publisher that reported it.
AI tools
Written by AI from the article text. It can make mistakes; check the original story.